• Reduced Construction Errors: Clash detection and resolution before construction provides a smooth construction phase with no design conflicts, fewer errors and re-work, and fewer schedule delays.
• Improved Collaboration: BIM management ensures an effective work process between architects, subcontractors, engineers, and consultants through enhanced communication.
• Cost and Time Savings: Through the efficiency with materials, faster delivery, and a lack of rework, BIM and BIM coordination show tangible savings in time and cost.
• Better Project Visualization: 3D BIM models offer advanced design visualization, enabling stakeholders to visualize complex designs better than pages of isolation drawings and helping them to view patterns, see how the structure is going to look on completion, and can be shown construction sequence.
• Successful Facility Management: As-built BIM model commissions and future renovations, facility management, and asset management through the building’s lifecycle are easy to manage with accurate BIM models.
• Increased Construction Feasibility: A well-coordinated model in BIM ensures that all design aspects can be ideally constructed in the field, as the models are coordinated with actual Building processes and on-site obstructions.
• Better Decision-Making through Data Centralization: Having all project data consolidated in one BIM model, stakeholders work with consistent and current data, and make sound and timely decisions. These combined benefits make Designheed the best among the BIM coordination services in India for efficient construction outcomes.