Construction of the Court Building Complex at Bhimavaram, West Godavari District andhra Pradesh is an example where BIM has been used to create a systematic design and documentation process for the institutional building.

In this project, Outlook Designheed Consultants Pvt. Ltd. has used Revit BIM to create a highly detailed LOD 350 model that supported Architectural Planning, Structural Coordination and GFC Documentation. The process included site planning, design development according to NBC norms, spatial planning and multi-disciplinary coordination.

Using BIM has made the process of creating accurate geometries, clash detection, coordinated design development and construction-ready documentation easier. The project helped improve coordination, reduce inconsistencies at the field level and ensure construction-ready to proceed based on the integrated architectural and structural information in the model.

Client’s Challenges

  • Coordinating architectural and structural elements within BIM.
  • Maintaining model accuracy for GFC documentation.
  • Resolving multidisciplinary interfaces before construction.
  • Ensuring NBC compliance and multidisciplinary coordination.
  • Minimizing construction discrepancies through coordinated documentation.

Our Approach and Solution

  • Developed a high-fidelity LOD 350 Revit model.
  • Integrated architectural and structural data centrally.
  • Conducted BIM model-based clash detection and resolution.
  • Integrated NBC regulatory requirements into design development.
  • Prepared coordinated GFC documentation using Revit.